How long can a circuit be before voltage drop matters?
No fixed length. Current × length decides.
16 A on 12 AWG
24 A on 10 AWG
40 A on 6 AWG
Drop grows with current × length and shrinks with voltage and wire size. The 3 % / 5 % figures are recommendations, not code rules. What is enforceable is the equipment’s own minimum voltage: 110.3(B) makes the listed instructions a requirement.
Run your numbers in Voltage DropWhat the web says
15 top answers, checked Nov 18, 2026Most pages get the 3 % / 5 % status right. None mention 110.3(B), the rule that makes an equipment maker’s minimum voltage enforceable, and a few give a length rule with no current or wire size attached.
How we checked: the top-ranked web pages for this question on Nov 18, 2026, each read in full and scored on the same checklist. We describe wrong claims, not the sites that make them.
Common circuits: where 3 % and 5 % are crossed
Copper, NEC Chapter 9 Table 9, PF 1.0. The load is 80 % of the breaker rating, a typical heavy steady load. Length is one-way. At half the load, the length doubles.
| Circuit | Load | Wire | 3 % at | 5 % at |
|---|---|---|---|---|
| 120 V, 15 A | 12 A | 14 AWG | ~48 ft | ~81 ft |
| 120 V, 20 A | 16 A | 12 AWG | ~56 ft | ~94 ft |
| 240 V, 30 A | 24 A | 10 AWG | ~125 ft | ~208 ft |
| 240 V, 50 A | 40 A | 6 AWG | ~183 ft | ~306 ft |
The same current on the same wire at 240 V goes twice as far as at 120 V, because the same volts lost are half the percentage.
Is 3 % a code requirement?
No. The 3 % branch-circuit and 5 % feeder-plus-branch figures are Informational Notes in 210.19(A) and 215.2(A). Some exceptions:
- Your AHJ, or an energy code, can make them mandatory. Some commercial energy codes do.
- Equipment instructions can. Motors, EV chargers, well pumps and LED drivers often list a minimum voltage. 110.3(B) makes the listed instructions enforceable.
- A failing drop is a design problem even when it’s legal. Motors run hotter, chargers charge slower, and lights dim when big loads start.
Common mistakes
- Entering the breaker size as the load. A 100 A breaker does not mean 100 A of load. At 150 ft, 3 AWG copper drops 3.13 % at 100 A but 1.41 % at a 45 A load.
- Using round-trip length. The calculators (and the NEC formula) take one-way length.
- Upsizing the breaker to fix voltage drop. Upsize the wire, keep the breaker. Then upsize the equipment ground in proportion (250.122(B)).
- Ignoring motor starting. A compressor or pump draws several times its running current for a moment. Steady-state 3 % can mean a 10 %+ dip at start.
Where people ask this
- Length of circuit to begin applying voltage drop calculations Mike Holt Forum
- Can I run 275 ft underground cable to a pole barn? DIY Stack Exchange
- Best way to get 20 amps to an outdoor office 150 ft from the breaker box DIY Stack Exchange
- Calculating voltage drop in a long 120 V / 240 V run r/AskElectricians
Questions are rephrased in our own words; Stack Exchange content is CC BY-SA and credited to the original authors. Every number on this page comes from the powercalc.tools voltage drop calculator (NEC 2023 Chapter 9 Table 9, steel conduit; PVC gives an equal or slightly lower drop). Not a substitute for your AHJ or a licensed electrician. See Methodology.